In Russia, they will begin to equip real estate with communal infrastructure more quickly

icon
20:05; 17 September 2024 year
ООО "Региональные новости"

© ООО "Региональные новости"

The list of cases where the preparation of documentation on the layout of the territory is not required for the construction and reconstruction of a linear facility has been amended by the Government of the Russian Federation. The corresponding decree was signed by Prime Minister Mikhail Mishustin.

Thus, the development of documentation on the layout of the territory will not be necessary for underground structures that are designed to accommodate and maintain engineering networks and cables. This should reduce the time required for the design and construction of communication collectors, which, in turn, will reduce the time required for the commissioning of real estate. 

In addition, innovations simplify the design and construction of some linear facilities within the boundaries of an industrial site. We are talking, in particular, about air ducts of aspiration systems, water pipes and conduits, slurry pipelines, railway tracks of non-public use, and so on. 

All changes are designed to reduce costs and expenses of the business.